翻訳と辞書
Words near each other
・ Shine a Light (McFly song)
・ Shine a Light (The Rolling Stones album)
・ Shine a Light (The Rolling Stones song)
・ Shine a Light (TV series)
・ Shine a Little Love
・ Shine Again Stakes
・ Shine Again Stakes top three finishers and starters
・ Shine Australia
・ SHINE Awards
・ Shine Begho
・ Shine Championship
・ Shine Down (song)
・ SHINE Expert System
・ Shine Eyed Mister Zen
・ Shine FM
Shinbundang Line
・ Shinbutsu bunri
・ Shinbutsu kakuri
・ Shinbutsu-shūgō
・ Shinbyu
・ Shinca Entertainment
・ Shincheonji Church of Jesus the Temple of the Tabernacle of the Testimony
・ Shinchi Station
・ Shinchi, Fukushima
・ Shinchiku Prefecture
・ Shinchireem
・ Shinchokusen Wakashū
・ Shinchosha
・ Shinchō
・ Shinchō kōki


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Shinbundang Line : ウィキペディア英語版
Shinbundang Line

The Shinbundang Line (aka ''Sinbundang Line''; Korean: 신분당선 (literally, ''New Bundang Line'')) or DX Line is a 17.3 km long line of the Seoul Metropolitan Subway. It is the world's fifth〔http://www.shinbundang.co.kr/index.jsp?pageID=/notice/notice2_view.jsp?no=612&open_main=3&open_sub1=2&open_sub2=0〕 subway to run completely driverless and the second completely driverless metro line to open in South Korea, after Busan Subway Line 4. It connects Gangnam Station and Jeongja Station in less than 16 minutes, which takes 30–35 minutes by express buses or 45 minutes using the Bundang Line, a feat achieved by being the first line to operate South Korea's next-generation subway car travelling at over 90 km/h.
The initial route passes through 6 stations intersecting with three existing lines at Gangnam Station (Line 2), Yangjae Station (Line 3), and Jeongja Station (Bundang Line). Phase 2 will add several stops to the southern end and Phase 3 is a 7.5 km extension northward from Gangnam station to Yongsan and both are currently under construction. The northern extension will extend the line north-west of Gangnam where it will cross several additional lines before ending at Yongsan Station. This additional stretch is estimated to cost at least 400 billion won.
An existing Bundang Maintenance depot, owned by KNR and located about 1 km south of Jeongja Station, is used for the SBL Project rolling stock maintenance. The SBL Line signal system is based on state-of-the-art communications-based train control (CBTC) technology, utilizing two-way digital radio communications between intelligent trains, and wayside equipment, and a network of ATS/ATO computers designed for very high system reliability and availability. Construction started in mid-2005, for revenue start in Sep 2011. However, because of the flooding of late July 2011, the opening was delayed and eventually opened on 28 October 2011.
The price to ride the Shinbundang Line is higher than standard fare for the rest of the Seoul subway system. The minimum cost is currently 2,150 won to ride (base subway fare of 1250 Won along with a 900 Won surcharge for using the line).
== Phases ==

Phase 1 is expected to alleviate some of the traffic from inner Seoul to Bundang which is mainly residential and within the greater Seoul area. The line is 17.3 km and intersects with several subway lines in south-eastern Seoul as well as with the Bundang Line. Travel from one end to the other is 16 minutes. Construction lasted for roughly six years starting in mid-2005 and ended at the end of October, 2011. Total cost between public and private sectors is estimated at 1.169 trillion won.
Phase 2 is a southern extension totaling 12.7 km currently under construction. The official station names at this point stand at SB1~SB5 ending in Gwanggyo. A groundbreaking ceremony signaled the start of construction with the planned projected completion in 2016.〔
Phase 3 will extend the northern side of the line from Gangnam where it will intersect Seoul Subway lines 1, 3 (again), 7, 9, and Jungang. It will cross the Han River and head west where it will end at Yongsan Station. The tunnel beneath the Han River was completed in August 2009.〔(【引用サイトリンク】 title=Tunnel sees daylight )
Several more phases have been under consideration. If approved, the section in Bundang would expand another 11.1 km to the south ending in Homaesil.〔 An additional consideration would be to push north beyond Yongsan Station and end around Gwanghwamun Station and Gyeongbokgung Station, making it easier for commuters to access Gangnam from the central business district of Seoul. It was unclear if this idea has been scrapped or pushed back for a later reevaluation〔(【引用サイトリンク】 title=Yongsan-Gangnam-Bundang subway completed in 2017 )〕 but resurfaced as a March 2012 campaign promise by Hong Sa-duk to expand the line near Gyeongbokgung Station]
There is talk about making the future Gwanggyo Station a transfer to EverLine.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Shinbundang Line」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.